Year of Projects: Week 34

One of my best besties is getting married next month. We’ve known each other since college, and have had SO MANY ADVENTURES together! I was thrilled and honored to be asked to be a bridesmaid and was over the moon excited when her mom asked if I could put together her bridal shower. This hasContinue reading “Year of Projects: Week 34”

Shoddy Seamstress Adventures: Placemats Part 3.2

Other stuff too. I mentioned in my last post that I found 6 placemats that I started a long time ago. I used quilting cotton on both sides and iron interface batting in the center. I “quilted” the fabric a little bit to keep everything flat. Two of the placemats were already bound, TERRIBLY. IContinue reading “Shoddy Seamstress Adventures: Placemats Part 3.2”

Shoddy Seamstress Adventures: Placemats Part 3

Phew! What an adventure! This morning, I finished up my new placemats. Instead of freehand sewing the interior rectangles today, I measured 2 inches from the side and then again from that first line, then made a pencil line rectangle as a guide. I measured yesterday’s prototype and most of my lines were at aboutContinue reading “Shoddy Seamstress Adventures: Placemats Part 3”

Soddy Seamstress Adventures: Placemats Part 2

I didn’t get the project finished today (didn’t think I would). I took the kids on a playdate to an outdoor park/playground with a friend. We picked up sandwiches up and had a lunchtime picnic in the empty pavilion. It was a windy day. I got to run to intercept friend’s toddler from the parkingContinue reading “Soddy Seamstress Adventures: Placemats Part 2”

Shoddy Seamstress Adventures: Placemats Part 1

When we move into the house back in 2012, we purchased a new dining room table. The top is really pretty, and I didn’t want to cover it up with a tablecloth. I found some cloth placemats at Home Goods, and purchased all they had. Without counting, I think I have 12. Even from theContinue reading “Shoddy Seamstress Adventures: Placemats Part 1”

Year of Projects: Week 32

My brain. So I have 7 patterns in various states of written. A TON that I need to make a reality. I said to myself the other day, “Self, no new patterns until we get some releases out”. What does my brain do?? IT PRACTICALLY FORCES ME TO KNIT A NEW DESIGN. The nerve!! ThisContinue reading “Year of Projects: Week 32”